Notice on environmental protection management and control of Tangshan City from 3 to 5 days

Relevant units in Tangshan City released specific measures for environmental protection management and control in Tangshan City from the 3rd to the 5th. The details are as follows:
1. Iron and steel enterprises: From 0:00 on the 3rd to 0:00 on the 5th, Donghai Special Steel will stop production of one 200-square-meter sintering machine and three 180-square-meter sintering machines; Donghai Iron and Steel will stop production of one 210-square-meter sintering machine. Please be sure to control CO, and report in time if there is an accident or hidden danger.
2. Coking industry: From March 3rd to 13th, A-level enterprises will voluntarily reduce emissions, B-level enterprises will extend the coke out time to 36 hours, and C-level D-level enterprises will extend the coke out time to 40 hours.
3. Cement clinker industry: From 0:00 to 5:00 on March 3, all rotary kilns for cement clinker were shut down; independent lime kilns were shut down from 3 to 13; Production will be suspended from 0:00 on the 5th to 0:00 on the 5th, and the non-leading type will be suspended from 0:00 on the 3rd to 24:00 on the 13th.
4. Brick and tile kilns: A-level kilns will reduce emissions by themselves, B-level kilns will stop entering new billets from 0:00 on the 3rd to 5th 0:00, and C-level D-levels will stop production from 3rd to 13th.
5. Refractory materials: A-level voluntary emission reduction, and B-level and below gas kilns will stop production from 3rd to 5th.
6. Ferroalloy enterprises: from 3rd to 13th, reduce the production load by 30% (measured by electricity consumption).
7. Rock and mineral wool enterprises: A-level enterprises will voluntarily reduce emissions, and B-level and below enterprises will stop production from the 3rd to the 5th.
8. Foundry enterprises (excluding blast furnace casting): Level A voluntary emission reduction, and enterprises with level B and below will stop production from the 3rd to the 5th.
9. Independent pelletizing and independent steel rolling enterprises: production will be suspended from the 3rd to the 5th.
10. Enterprises of comprehensive utilization of dust removal and ash: stop production from 3rd to 13th.
11. Waste incineration power generation enterprises: From the 3rd to the 5th, keep one production line for minimum load production.
12. Mobile sources: Among them, key vehicle-using units and logistics and transportation enterprises are prohibited from entering and leaving the factory from 0:00 on the 3rd to 0:00 on the 5th. Excluding security, epidemic prevention and control, and new energy. From the 3rd to the 13th, the transportation of muck trucks is prohibited from 18:00 to 8:00 the next day, and the operation of non-road mobile machinery is stopped. Excludes vehicles and machinery that are included in the mobile source whitelist.
13. Non-point source: mining enterprises will stop open-air operations from 0:00 on the 3rd to 0:00 on the 5th; construction sites will stop earthwork and construction sites from 18:00 to 8:00 the next day from March 3rd to 13th, except for emergency rescue. Except for demolition, slope protection shotcrete, and spray painting that are included in the whitelist of non-point sources of engineering, the projects on the white list of non-point sources of engineering must strictly implement 6 percent and 2 full coverage.