The supporting sewage discharge project of the Shanghai Baoshan Renewable Energy Utilization Center Project is located on the main road in Shanghai, and the pipeline needs to cross the road. Customers have high requirements on construction safety and quality. Pipeline construction should avoid impact on surrounding traffic, river courses, structures (buildings), etc. Knowing the needs of customers, Xinxing Cast Pipe Shanghai Sales Branch recommended a DN300*1.5m micro-pipe jacking construction plan, which not only ensures construction needs but also reduces material costs.
At the beginning of January, 93 micro-jacking pipes of DN300*1.5 meters arrived at the construction site. The total length of the project is 113 meters, and it took only 3 days from the guide to the pipe jacking to be successfully completed, setting a record for the longest construction of a single section! Up to now, Xinxing Casting Pipe has implemented micro-jacking pipes with various lengths of 1 meter, 1.5 meters and 2 meters in Shanghai. The ductile iron micro-jacking pipe is simple to install, fast to construct, and the construction progress can be guaranteed, and its advantages in trenchless projects are fully reflected.

Xinxing Cast Pipe leads the upgrading of products and services with technological innovation, continuously meets customer needs, diverts water for people’s health, and contributes emerging wisdom and emerging solutions to the water industry!